• Underlayment that enhances fire safety and sound attenuation
  • Ideal for multifamily and light commercial construction
  • Installed by Maxxon-approved applicators
  • ..." /> <

    Maxxon Corporation -Rapid Floor® Multifamily Gypsum Floor betway live casino login

    DOWNLOADS

    • betway live casino login that enhances fire safety and sound attenuation
    • Ideal for multifamily and light commercial construction
    • Installed by Maxxon-approved applicators
    • More than 140 UL & ULC Fire-Resistance-Rated Designs


    Category: search | Search Results for Ca | Search Results for categor...

    MasterFormat: 03 50 00 - Cast betway live casino login | 03 54 13 - Gypsum Cement betway sports be | 09 05 71 - Acoustic Betway online ca...



    Maxxon Corporation
    920 Hamel Road
    P.O. Box 253
    Hamel, MN 55340
    Tel: (800) 356-7887
    Fax: (763) 478-2431

    info@maxxon.com

    https://maxxon.com/

    Find a rep/distributor

    Request More Info

    DOWNLOADS

    Related Products

      Overview


      Rapid Floor® Multifamily Gypsum Floor betway live casino login

      • betway live casino login that enhances fire safety and sound attenuation
      • Ideal for multifamily and light commercial construction
      • Installed by Maxxon-approved applicators
      • More than 140 UL & ULC Fire-Resistance-Rated Designs
      • GREENGUARD Gold Certified

      Application
      Multifamily and light commercial wood frame construction.

      Subfloor
      Interior wood, concrete, steel.

      Code Listings:

      • ICC ESR-2540
      • UL ER8477-01
      • HUD1286e
      • GREENGUARD Certified
      • GREENGUARD Gold Certified


      See More


      Specifications

      Technical Data
      Installation DepthsFrom 3/4" to 3" (19 - 76 mm). For deeper pours.
      Compressive StrengthTypical range of 2,000 - 3,200 psi (13.8 - 22.1 MPa)
      Dry Density110-120 lbs./ft3 (1762-1922 kg/m3)
      Packaging80 lbs. bag
      Storage Temperature50 - 100 °F (10 - 38 °C)
      Dry Time3/4" (19 mm) thickness drying time is usually 5 to 7 days, while 1" (25 mm) dry time is usually 7-10 days
      Installation Temperature50 °F (10 °C) for at least 24 hours prior to installation and until betway live casino login has set
      Trade Traffic24 hours after installation
      Set time to walk on surface, typically 2-4 hours
      Fire Performance (ASTM E84)Flame Spread - 0
      Fuel Contribution - 0
      Smoke Development - 0
      Green Information
      ProjectCreditCategory
      Environmental QualityEQ 2Low Emitting Materials
      EQ 4Indoor Air Quality Assessment
      EQ 9Acoustic Performance
      Materials & ResourcsMR 3Building Product Disclosure and Optimization - Sourcing Raw Materials